打开APP
userphoto
未登录

开通VIP,畅享免费电子书等14项超值服

开通VIP
2012高考英语阅读理解强化练习(99)

[稀饭阅读]高中版2012高考英语阅读理解强化练习(99)

2012年03月16日15:59  来源:新东方在线 【发表评论

    

    A few years ago, Paul Gerner began to gather a group of architects in Las vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning . "I think half of them fell off their chairs," Gerner says.

    Gerner manages school facilities (设施)for Clark county, Nevada, a district roughly the size of Massachusetts. By 2018, 143, 000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (样品) ; They plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.

    Green schools are appearing all over , but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. "One of the biggest challenges is getting the right site orientation(朝向), " Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. "You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool."

    Surprisingly, the man responsible for one of re most progressive green-design competitions has doubts about ideas of eco-friendly buildings. "I don't believe in the new green religion," Gerner says. "Gerner says."Some of the building technologies that you get are impractical. I'm interested in those that work. "But he wouldn't mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. "You never know what's going to start the interest of a child to study math and science,"he says.

    1.How did the architects react to Garner's design requirements?

    A. They lost balance in excitement.

    B. they showed strong disbelief.

    C. they expressed little interest.

    D. they burst into cheers.

    2.Which order of steps is followed in carrying out the project?

    A. Assessment-Prototype-Design-Construction.

    B. Assessment-Design-Prototype-Construction.

    C. Design-Assessment-Prototype-Construction.

    D. Design-Prototype-Assessment-Construction.

    3.What makes it difficult to build green schools in Clark County?

    A. The large size.

    B. Limited facilities.

    C. The desert climate.

    D. Poor natural resources.

    4.What does Gerner think of the ideas of green schools?

    A. They are questionable.

    B. They are out of date.

    C. They are advanced.

    D. They are practical.

    答案  :

    1.B

    解析:I think half of them fell off their chairs这一句表示了作者对这个提议的不信任,顾选择B

    2.D

    解析:Assessment  n. 评定;估价

    Prototype  n. 原型;标准,模范

    Design     n. 设计;图案  vi. 设计 vt. 设计;计划;构思

    Construction.  n. 建设;建筑物;解释;造句

    根据词义可判断顺序应为

    D. Design-Prototype-Assessment-Construction

    3.C

    解析:在第三段段首就指出在克拉克镇建立绿色学校最大的难题来自于其沙漠气候,故根据文章大意本题选择C

    4.A

    解析:本文主旨便是在讲环保建筑的推广之困难,受各个方面的掣肘,所以根据文章主旨应选择A选项,这是一个存在很多问题的想法

本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存 查看更多类似文章
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
在家呆着没意思?50部建筑师必看纪录片,保证让你满意
Green Valley Project Proposal / Schmidt Hammer Lassen Architects | ArchDaily
Legislature reviews draft to curb Shanghai sinking
【英语中的颜色】
建议收藏丨六种常见颜色在英语里还能代表什么?快来涨姿势!
英语“You are so green”,意思是“你很绿”?别乱说哦
更多类似文章 >>
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服