打开APP
userphoto
未登录

开通VIP,畅享免费电子书等14项超值服

开通VIP
景德镇市MedAccred _AC8121电子电缆和线束组件的审核标准 (46

25.3 P- Is there a procedure for control of soldering tools / equipment including:

25.3.1 P- Selection and setup?YES/NO

25.3.2 P- Maintenance and periodic verification, including soldering iron tips for temperature?YES/NO

25.3.3 P- If required is the soldering system in calibration or verified?YES/NO/NA

Audit Note: Some soldering systems may require calibration.

25.4 P- Is there a procedure that defines the method of preventing cross contamination of solder alloys and fluxes?YES/NO

25.5 P- Is there a procedure to control solder pot contamination per the J- STD-001?YES/NO

25.6 P- Is there a procedure for cleanliness of soldered connections? YES/NO

25.7 P- If required, is there a procedure for shrink sleeving on soldered joints?YES/NO/NA

25.8 P- If no-clean flux is required, is there a procedure for its use and the subsequent inspection of joints soldered with it?YES/NO/NA

25.9 P- Is there a procedure that defines the cleaning method, chemical and maximum time permitted between hand soldering and cleaning for each flux chemistry and solder used?YES/NO/NA

Audit Note: NA refers to when Cleaning is not used.

25.10 P- Is there a process control in place to ensure solder cups have the wire(s) inserted to the full depth of the cup?YES/NO

Audit Note: It is a defect in IPC/WHMA-A-620 if the wire is not inserted to the full depth of the cup. However, this is not visually inspectable. It is determined through process control. For example, this may be controlled by using strip length.

本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
违规受礼和受贿的区别及数额的认定指引
那些让女人很掉价的6个行为,一定不要随便做
曾是我国的“救命粮”,现在却十分少见?反观美国却在疯狂种植?
胡宝岭:相对人是否有权请求对不在征收范围的对象实施行政征收?
爱的絮语
电脑怎么设置WiFi?简单实用方法分享!
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服