打开APP
userphoto
未登录

开通VIP,畅享免费电子书等14项超值服

开通VIP
山东省MedAccred _AC8102热处理基准审核标准【5】

pre-defined frequencies? YES/NO

3.8.3 (C) Is there evidence that changes, such as new product introduction, new processes, new or modified equipment, or process changes are assessed for risk and validation requirements, which may include the need to validate or revalidate? YES/NO/NA

Note: NA applies only when no changes, such as those described above, have been implemented.

3.8.4 (C) Is there evidence that process validation is being done per the procedure? YES/NO

3.8.5 (C) Is there evidence that acceptance criteria were established prior to execution of the validation? YES/NO

3.8.6 (C) Is there evidence of a sampling plan that demonstrates establishment of the process, as well as the rationale for that selected sample size? YES/NO/NA

Auditor Handbook: NA would be acceptable if customer determines the sampling size and the Supplier/Contract Manufacturer accepts that sampling size for adequacy of demonstrating their confidence in consistently producing the part.

3.8.7 (C) Is there evidence that indicates by operating at worst case processing parameters the product will still meet all predetermined requirements? YES/NO

Auditor Handbook: “Worst Case (maximum load)” is a combination of variables that will provide the most difficult challenge to the process, ensuring a quality outcome.

3.8.8 (C) Is there evidence that risk control mitigation is in place for product and processes (e.g., pFMEA)? YES/NO

4. PERSONNEL

4.1 Training

4.1.1 Are there training procedures that assure personnel performing heat treating and associated quality and test functions are competent to perform assigned tasks? YES/NO

4.1.2 Do records indicate that training is scheduled and attended in accordance with procedures and documented? YES/NO

4.2 Evaluation of Personnel

4.2.1 Do procedures require periodic evaluation to ensure that approved personnel maintain proficiency in their assigned heat treating and related tasks? YES/NO

4.2.2 Do records indicate that the evaluations are performed at documented frequencies and the results reviewed with employees? YES/NO

5. MATERIAL HANDLING AND TRACEABILITY

5.1 Incoming Material to Processing

5.1.1 Are identification, count and quality discrepancies resolved prior to processing of parts? YES/NO

5.1.2 Do procedures ensure that incoming customer documents remain traceable to those specific jobs throughout processing? YES/NO

5.1.3 When more than one production job is processed in a furnace at the same time, is traceability maintained for each production job processed? YES/NO/NA

5.2 General Cleaning

5.2.1 Does the internal procedure require that parts be clean prior to loading for processing in the furnaces? YES/NO

5.2.2 Do records indicate that the procedure is followed? YES/NO

5.3 Corrosion Resistant Steels Cleaning SECTION NA

本站仅提供存储服务,所有内容均由用户发布,如发现有害或侵权内容,请点击举报
打开APP,阅读全文并永久保存
猜你喜欢
类似文章
【热】打开小程序,算一算2024你的财运
炖鸡不香?试试这5种香料,让你的鸡肉软而不烂、弹牙且香味入骨
如何才能快速约女人出来呢?教你三招 很多男人想泡妞,有色心又有
初中英语语法“8大时态”详细总结,越是理解不透彻,越是要死磕
干货!5款Windows必装的软件,免费又实用,让你的电脑无所不能
一口气帮你搞懂红楼梦的所有人物关系,考试必备
深度长文:超越光速就能回到过去吗?(超4000字,建议收藏)
生活服务
热点新闻
分享 收藏 导长图 关注 下载文章
绑定账号成功
后续可登录账号畅享VIP特权!
如果VIP功能使用有故障,
可点击这里联系客服!

联系客服